“From Order to site in no time!”

“From Order to site in no time!”

One of our recent clients, a logistics firm in Hong Kong, needed a temporary operations office—fast. Within 72 hours of placing their order, their Luban Cabin was delivered, installed, and connected to power.“The entire process was incredibly smooth,” the manager...
What Happens Before Your Cabin Arrives

What Happens Before Your Cabin Arrives

Before a Luban Cabin reaches your site, there’s a lot happening behind the scenes. Our quality control team inspects each unit for structural integrity, plumbing, wiring, and insulation. Once approved, we schedule delivery with your preferred timing in mind.We pack...
How We Install Your Cabin in No Time

How We Install Your Cabin in No Time

Wondering how long it takes to get a Luban Cabin up and running? The answer: not long at all. Our mobile cabins are designed for quick setup, and our trained installation team ensures that each unit is leveled, secured, and ready for immediate use. Whether it’s a site...
Smooth Delivery, Every Time

Smooth Delivery, Every Time

At Luban Cabins, we know that timely delivery is just as important as the product itself. That’s why we’ve streamlined our logistics to ensure every cabin reaches its destination safely and on time. Whether you’re in a bustling city or a remote rural area, our team...